Rail King Y6b 2-8-8-2 Betriebsanleitung

Stöbern Sie online oder laden Sie Betriebsanleitung nach Kleine Küchengeräte Rail King Y6b 2-8-8-2 herunter. Rail King Y6b 2-8-8-2 Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
RAILKING Y6b 2-8-8-2
STEAM ENGINE
OPERATING INSTRUCTIONS
This RailKing Y6b 2-8-8-2 Steam Engine is produced in detailed Die-Cast Metal and
operates on O-31 track.
This RailKing Steam Engine contains state-of-the-art electronics
with many built-in automatic features for incredibly realistic operation. Despite these
advanced features, the locomotive is easy to operate with any compatible standard AC
transformer (see the compatibility chart on page
18), and is completely compatible with
most other 3-rail locomotives, rolling stock, and accessories.
This locomotive is equipped with Proto-Sound 2.0 with Digital Command System
(DCS). This new system will allow you to operate your locomotive in Command mode
mode. Conventional operating features are described in the following pages, while the
DCS operating features are covered in the set of operating instructions that
accompanies the DCS equipment.
Conventional Mode operation of this locomotive is
much simpler than operation of original Proto-Sound engines. For your own safety and
that of your equipment, please read the instructions before you operate this engine.
Seitenansicht 0
1 2 3 4 5 6 ... 23 24

Inhaltsverzeichnis

Seite 1 - OPERATING INSTRUCTIONS

RAILKING Y6b 2-8-8-2 STEAM ENGINEOPERATING INSTRUCTIONSThis RailKing Y6b 2-8-8-2 Steam Engine is produced in detailed Die-Cast Metal andoperates on O-

Seite 2

10RailKing Y6b 2-8-8-2 Steam EngineMaintenance:Lubrication and Greasing InstructionsThe engine should be oiled and greased in order to run properly.Yo

Seite 3

11RailKing Y6b 2-8-8-2 Steam EngineCleaning the Wheels, Tires and TrackPeriodically check the locomotive wheels and pickups for dirt and buildup,which

Seite 4 - Basic Operation

12RailKing Y6b 2-8-8-2 Steam EngineProtoSmoke® Unit OperationThis steam locomotive contains a smoke unit that outputs smoke through thesmokestack on t

Seite 5

13RailKing Y6b 2-8-8-2 Steam Enginethe smoke unit inspection cover from the locomotive’s body (see Fig. 6). After removing the chassis and inspection

Seite 6 - Freight Yard Sounds (FYS):

14RailKing Y6b 2-8-8-2 Steam EngineSelf-Charging Battery Back-UpThe special NiCad 7-cell 8.4v self-charging battery in this engine improvesperformance

Seite 7 - Tips on Using FYS

15RailKing Y6b 2-8-8-2 Steam EngineTroubleshooting Proto-Sound® 2.0 ProblemsAlthough Proto-Sound 2.0 has been designed and engineered for ease of use,

Seite 8 - Speed Control:

16RailKing Y6b 2-8-8-2 Steam Engine

Seite 9 - Automatic Sounds:

17RailKing Y6b 2-8-8-2 Steam EngineCompatibilityThis engine will operate on any traditional O-31 or larger O Gauge tracksystem, including M.T.H.’s Rea

Seite 10 - Maintenance:

18RailKing Y6b 2-8-8-2 Steam EngineTransformer Compatibility and Wiring ChartNote that many of the operational commands described in these instruction

Seite 11

19RailKing Y6b 2-8-8-2 Steam EngineAdditional Features Accessible with the DCS Remote Control System:While conventional mode operation of a Proto-Soun

Seite 12 - Unit Operation

2RailKing Y6b 2-8-8-2 Steam EngineTable of ContentsSet Up 3Basic Operation 4Throttle 4Operation Buttons 4Volume Control 4Proto-Sound 2.0 Operation 5A

Seite 13 - Fire Box Light

20RailKing Y6b 2-8-8-2 Steam Engine• Proto-Effects™ Set Up-User can select individual Proto-Effects™ operations to be active or inactive, including ca

Seite 14 - Self-Charging Battery Back-Up

21RailKing Y6b 2-8-8-2 Steam EngineCAUTION: Electrically Operated Product:Not recommended for children under 10 years of age. M.T.H. recommendsadult

Seite 15 - 2.0 Problems

22RailKing Y6b 2-8-8-2 Steam Engine

Seite 16

23RailKing Y6b 2-8-8-2 Steam Engine

Seite 17 - Compatibility

Service & Warranty InformationHow to Get Service Under the Terms of the Limited One-Year WarrantyFor warranty repair, do not return your product t

Seite 18

3RailKing Y6b 2-8-8-2 Steam EngineSet UpThere are a few simple steps you must take before operating this RailKingsteamer. 1. You should prime the ope

Seite 19 - Control System:

4RailKing Y6b 2-8-8-2 Steam EngineBasic OperationThrottle – Throttle up the power to your track. Give about 10-12 volts orenough power so that the eng

Seite 20

5RailKing Y6b 2-8-8-2 Steam EngineProto-Sound 2.0 Operating InstructionsThis manual contains the operating instructions for Proto-Sound 2.0 inconventi

Seite 21

6RailKing Y6b 2-8-8-2 Steam EngineFreight Yard Sounds (FYS): Your engine is equipped with a sound package of freight yard sounds that youcan play when

Seite 22

7RailKing Y6b 2-8-8-2 Steam EngineTips on Using FYS• You can terminate FYS at anytime by turning off power to thetrack for 15 seconds.• You do not hav

Seite 23

8RailKing Y6b 2-8-8-2 Steam EngineProto-Coupler® OperationThis locomotive is equipped with one coil-wound Proto-Coupler for remoteuncoupling action.

Seite 24 - Limited One-Year Warranty

9RailKing Y6b 2-8-8-2 Steam EngineLock into a Directional State:You can lock your engine into a directional state (forward, neutral, or reverse)so tha

Kommentare zu diesen Handbüchern

Keine Kommentare